07.06.2011  Directorate for Information and Public Relations of Rosenergoatom Concern OJSC

Head of Rostekhnadzor Nikolay Kutyin has signed an amendment to the License for Operation of Kola NPP power unit No. 3

On May 31, 2011 Head of Rostekhnadzor Nikolay Kutyin signed Amendment No. 1 to the License for Operation of Kola NPP power unit No. 3 (GN-03-101-2503 of 2.04.2011), granting the right for carrying out all process operations except for operation at the minimum controlled reactor power (MCRP) and energy power level.

Amendment No. 1 provides the right to operate power unit No. 3 in all operating conditions, stipulated by the process regulations, including Тcritical reactor (operation at MCRP) and operation at the energy power levelУ.

The license has been issued for 5 years. Amendment No. 1 specifies the measures to be taken by the time of completion of scheduled preventive maintenance of 2012.


Back to the list