02.02.2011  Public Information Centre of Balakovo NPP

Balakovo NPP: the January plan has been fulfilled by 109.1 %

Balakovo NPP has fulfilled the January target by 109.1 per cent. In January the plant generated 2,452,107.744 thousand kWh of electric power. 

The utilization factor of maximum capacity is 82.4 per cent.

Balakovo NPP was under safe and reliable operation. At present it operates all three power units. On January 8 power unit No. 2 was shut down for repair in accordance with the Russian NPP power units repair schedule for 2011.

Timely information about operation of the plant is available twenty four hours by answering machine of the Public Information Centre of Balakovo NPP (845-3) 62-22-20.

Timely information about the radiation environment near Russian NPPs and other objects of the nuclear industry is available in the site www.russianatom.ru.


Back to the list