Filter
Activity Start Date: Select date in calendarSelect date in calendar
  

3 May 2018  Information and Public Relations Department Rosenergoatom
At the site of Kursk NPP-2 the construction of the new power units has started
At the site of Kursk NPP-2 the construction of the new power units has started
On 29 April, 2018 at the construction site of Kursk NPP-2 the first cubic meters of concrete were poured in the bed plate of the power unit No 1 reactor building.

28 April 2018  The Communications Department of ROSATOM
The world's only floating power unit (FPU) “Akademik Lomonosov” takes the sea
The world's only floating power unit (FPU) “Akademik Lomonosov” takes the sea
On 28 April, 2018, the world's only floating nuclear power unit (FPU)* “Academik Lomonosov” has left the territory of Baltiyskiy Zavod in St. Petersburg, where its construction had been carried out since 2009, and headed to its base in Chukotka.

25 April 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP: the reactor unit of the innovative VVER-1200 power unit No 1 was put at 75% capacity for the first time
Leningrad NPP: the reactor unit of the innovative VVER-1200 power unit No 1 was put at 75% capacity for the first time
The next substage of the experimental and industrial operation of the innovative VVER-1200 power unit No 1 has started at Leningrad NPP: the specialists put the power unit at 75% capacity and proceeded to the unit’s equipment and technological systems testing set by the program for the power testing.

23 April 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP hosted the Leningrad Region Government's field office
Leningrad NPP hosted the Leningrad Region Government's field office
The working group of the field office included heads of government committees on the fuel and energy complex, architecture and town planning, economic development and investments, management of Leningrad NPP, and executives from constructor and general contractor organizations.

12 April 2018  The Rosenergoatom, Joint-Stock Company information and PR department
Rosenergoatom became the winner of 2018 SAP Quality Awards in the CIS region in the Business transformation category
Rosenergoatom became the winner of 2018 SAP Quality Awards in the CIS region in the Business transformation category
Rosenergoatom (a part of Rosatom’s Electric Energy Division) won the gold of 2018 SAP Quality Awards for the successful implementation of the project on the basis of SAP, that is the creation of the unified resource management system. This system has been developed at all Russian NPPs and other branches of the company since 2017.

5 April 2018 
Rosenergoatom has concluded its first international contract to improve the country's regulatory frameworks for nuclear industry
Rosenergoatom has concluded its first international contract to improve the country's regulatory frameworks for nuclear industry
Rosenergoatom, Joint-Stock Company has started to sell a new business product on foreign markets. It is the services on building a database of regulatory and methodological technical documentation (hereinafter referred to as RTD), necessary for commissioning, operation, service life extending, and decommissioning of nuclear power plants.

2 April 2018 
Rosenergoatom will take part in anniversary 10th International Forum Atomexpo 2018 in Sochi
Rosenergoatom will take part in anniversary 10th International Forum Atomexpo 2018 in Sochi
Rosenergoatom, Joint-Stock Company will take part in anniversary 10th International Forum Atomexpo 2018 that will be held from 14 to 16 May, 2018 in the Main Media Center in Sochi.

26 March 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP-2: at the innovative power unit No 1 the final stage of commissioning – experimental industrial operation – has been started
Leningrad NPP-2: at the innovative power unit No 1 the final stage of commissioning – experimental industrial operation – has been started
On 26 March, 2018, Leningrad NPP-2 (a branch of Rosenergoatom, a part of Rosatom’s Electric Power Division) started the Experimental Industrial Pilot Operation stage at the innovative 3+ generation* power unit No 1 with the VVER-1200 reactor – the specialists have started a gradual power ascension in the reactor. The permission to begin the stage was issued by the Federal Environmental, Industrial and Nuclear Supervision Service of the Russian Federation (Rostekhnadzor)

22 March 2018  NOVOVORONEZH NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
At the power unit No 2 of Novovoronezh NPP-2 the generator assembly has started
At the power unit No 2 of Novovoronezh NPP-2 the generator assembly has started
In the turbine island of Novovoronezh NPP-2 power unit No 2 (power unit No 7 of Novovoronezh NPP) the specialists have proceeded to the assembly of the turbine generator TZV-1200.

19 March 2018  THE ROSTOV NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
Rostov NPP: physical tests with 75% capacity are carried out at the new unit No 4 under the pilot operation
Rostov NPP: physical tests with 75% capacity are carried out at the new unit No 4 under the pilot operation
At the new power unit No 4 of Rostov NPP (Volgodonsk, a branch of Rosenergoatom Concern, a part of Rosatom’s Electric Power Division), the reactor unit undergoes physical tests as a part of the Experimental Industrial Pilot Operation (EIP) stage with the development of 75% of the normal capacity.

9 March 2018  THE DEPARTMENT OF INFORMATION AND PUBLIC RELATIONS OF ROSENERGOATOM CONCERN JSC
Leningrad NPP: Unit 1 with VVER-1200 connected to the national grid
Leningrad NPP: Unit 1 with VVER-1200 connected to the national grid
On the 9 of March 2018, at 09:19, the most important operation was completed, i.e. Leningrad NPP Unit 1’s generator was synchronized with the grid and the unit started delivering first kilowatt-hours to the United Energy System of Russia. Innovative Unit 1 with a Generation III+ reactor VVER-1200 is installed at Leningrad Phase II (a branch of Rosenergoatom which is part of the Power Division of ROSATOM).

1 March 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP: At the innovative power unit No 1 with VVER-1200 reactor the turbine trial run is successfully completed
Leningrad NPP: At the innovative power unit No 1 with VVER-1200 reactor the turbine trial run is successfully completed
On 1 March, 2018 at 00:24 MSK at Leningrad NPP (a branch of Rosenergoatom Concern, a part of Rosatom’s Electric Energy Division) the turbine trial run of the innovative power unit No 1 with VVER-1200 reactor has been completed: the specialists made it run at idle, gradually increasing the number of rotations up to the design values.

27 February 2018  THE ROSTOV NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
Rostov NPP: power unit No 4 dynamic tests under pilot operation are completed
Rostov NPP: power unit No 4 dynamic tests under pilot operation are completed
At the power unit No 4 of Rostov NPP (Volgodonsk, a branch of Rosenergoatom Concern, a part of Rosatom’s Electric Power Division), the dynamic tests were carried out within the framework of the Experimental-Industrial Pilot Operation stage.

22 February 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP-2: the most important stage of launch operations has begun at the 3+ generation innovative power unit No 1
Leningrad NPP-2: the most important stage of launch operations has begun at the 3+ generation innovative power unit No 1
On 22 February, 2018, at 03:15 (MSK) Leningrad NPP-2 (a branch of Rosenergoatom Concern, a part of Rosatom’s Electric Power Division) has started the power start-up stage of the 3+ generation innovative power unit No 1 with the VVER-1200 reactor. The permission for the start-up was issued by the Federal Environmental, Industrial and Nuclear Supervision Service of the Russian Federation (Rostekhnadzor)

19 February 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP has reached the annual target for the isotope production and provided the state defense order for doped silicon
Leningrad NPP has reached the annual target for the isotope production and provided the state defense order for doped silicon
Leningrad NPP (a subsidiary of Rosenergoatom Concern, a part of the Rosatom Electric Power Division) exceeded the plan for isotope production for 2017 and fully provided the defense industry with doped silicon.

14 February 2018  KURSK NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
“The construction of Kursk NPP-2 power units No 1 and 2 has the key value for Rosatom”, Aleksey Likhachev, the Head of the State Corporation
“The construction of Kursk NPP-2 power units No 1 and 2 has the key value for Rosatom”, Aleksey Likhachev, the Head of the State Corporation
The Construction of power units No 1 and 2 of Kursk NPP-2 – the advanced product in the field of high nuclear technology – has the key value for Rosatom State Corporation.

8 February 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP-2: the newest 3+ generation power unit No 1 with VVER-1200 reactor is brought to a minimum controllable power
Leningrad NPP-2: the newest 3+ generation power unit No 1 with VVER-1200 reactor is brought to a minimum controllable power
On 6 February, 2018, the reactor unit of the new super power 3+ generation unit No 1 of Leningrad NPP-2 (a part of Rosatom Electric Energy Division) was brought to a minimum controllable power (MCP, less than 1%). A controlled fission chain reaction began in the reactor; and the neutron flux monitoring equipment recorded the reactor’s stable neutron power. The MCP is one of the final physical start-up operations at the power unit No 1.

1 February 2018  The Department of Information and Public Relations of Rosenergoatom Concern JSC, The Communications Department of Group of Companies ASE
Rostov NPP: President of Russia Vladimir Putin gave the start to the program of bringing up Rostov-4 to design power
Rostov NPP: President of Russia Vladimir Putin gave the start to the program of bringing up Rostov-4 to design power
At 18:00 President of Russia Vladimir Putin gave the start to the program of bringing up Rostov-4 to design power.

21 January 2018 
Leningrad NPP has reached the unprecedented electric energy generation for Russian NPPs – 1 trillion kWh
Leningrad NPP has reached the unprecedented electric energy generation for Russian NPPs – 1 trillion kWh
On 20 January, 2018 Leningrad NPP (town of Sosnovy Bor, branch of Rosenergoatom, a part of Rosatom Electric Energy Division) reached the point of 1 trillion kWh; this is the record number for Russian Nuclear Power Plants.

16 January 2018  THE ROSTOV NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
Rostov NPP: Rostekhnadzor checks the new power unit No 4 before its power start-up
Rostov NPP: Rostekhnadzor checks the new power unit No 4 before its power start-up
The commission of the Federal Environmental, Industrial and Nuclear Supervision Service (Rostekhnadzor) has begun testing Rostov NPP power unit No 4 (Volgodonsk, a branch of Rosenergoatom Concern, a part of Rosatom Electric Power Division), which will be followed by the decisive stage of launch operations –the power start-up. The general designer and contractor for the Rostov NPP power units is ASE Group of Companies, the engineering division of Rosatom.


Pages: Prev. 1 ... 8 9 10 11 12 ... 18 Next